Stem and keel assembly attached to frames
View from stem
Transom assembly braced on form
Frames cut and laid out on table prior to assembly
Transom and frame assembly glued and clamped prior to installation
Chines, sheers, breasthook and bottom battens installed
Jet drive tunnel installed
transom view of jet drive tunnel
Side planking installed
Installing bottom planking
Fibreglass cloth with first coat of epoxy sanded
Third coat of epoxy drying
Hull prior to installation of fibreglass
Swim platform/jet pump mount fitted
First coat of paint completed
First coat of paint viewed from bow
Three coats of paint Swim platform installed and painted jet pump installed
Carlings, deck beams and deck battens installed
Dashboard installedCockpit Floor fitted |
Mahogany stringers, frames and transom assembled on 2x4 building form |